Here is a question. UPI works because your phone talks to a bank server. But that server is somewhere in a big city. The signal has to travel. On what?
On optical fibre. Thin strands of glass, buried in the ground or hung on poles, carrying light. That light is your money moving, your data moving, your video call happening.
Cities have this fibre. Big towns have it. But six lakh villages in India — did they have it in 2011? No. They did not. Which meant that even if UPI worked in principle, the last five kilometres to the village would be running on old copper telephone lines, or on patchy mobile signal, or on nothing at all.
So in 2011, the government said: we will lay fibre to every gram panchayat. Every single one. Two and a half lakh of them. This was called the National Optical Fibre Network (NOFN). In 2015, it was renamed BharatNet. It is funded by the Universal Service Obligation Fund (USOF) — a pool of money that all telecom companies contribute to, meant specifically for reaching areas that private telcos would never reach on their own.
The plan was simple. The execution was not.
The Phase Story — What Actually Happened
Phase 1 (2011-2017). Target was one lakh gram panchayats. It got extended to 1.25 lakh. Done by BSNL, RailTel and PowerGrid — three government undertakings that already had some fibre network. This phase was completed, more or less, by the end of 2017.
Phase 2 (2017 onwards). Target was the next 1.5 lakh gram panchayats. This phase used a mix of models — state-led (Chhattisgarh, Gujarat, Andhra Pradesh and others), CPSU-led (BSNL), and private-led (Punjab, Bihar). The deadline kept shifting. Original target was March 2019. Then August 2021. Then 2023. Even today, not fully complete.
Phase 3 (approved August 2023, currently rolling out). This is the big one. The Union Cabinet approved Rs 1.39 lakh crore for Phase 3. The target is to connect all 6.4 lakh villages — not just gram panchayats but every village — to the middle-mile network. Bharat Broadband Network Limited (BBNL), which was managing the earlier phases, was merged into BSNL in 2022 to speed things up. The new phase also brings in a fresh idea called the BharatNet Udyami model, where local village-level entrepreneurs become the last-mile fibre operators, earning a livelihood from providing broadband to households.
But Here Is the Uncomfortable Part
You should be honest about numbers when you write in mains. The story is not a straight success.
- By March 2026, only about 13.23 lakh fixed connections had been commissioned under BharatNet — against a target of 18 lakh for that milestone.
- Of these, only around 8 lakh connections were actively being used. Less than half of what was targeted was actually seeing usage.
- New connections have been slowing — around 7,000 per month in recent periods, when the requirement is many multiples of that.
- Parliamentary committee reports have repeatedly flagged shifting goalposts, weak coordination, and slow approvals.
The reasons are not one thing. They are many things stacked together — BSNL's financial condition, poor maintenance of installed equipment, state governments delivering slowly, private telcos already covering some villages so demand for BharatNet is lower there, and the demand-side problem that even where fibre reaches, households often do not have the device or the digital literacy to use it.
This is where a good UPSC answer separates itself from an average one. The challenge is not just laying fibre. It is building the entire ecosystem — devices, skills, useful local content in local languages, affordable pricing — so that the fibre is actually used. Supply of pipe without demand for water is a wasted pipe.